Free tool

Availability SLA calculator, yearly and monthly

How much downtime fits in 99.9%? What was the availability of a trunk that was down for an hour this month? The calculator answers both ways, with real years and months, and takes planned maintenance out.

What you want to work out
99.9% availability over a 365-day year allows 8 h 45 min 36 s of downtime.

What is the availability SLA formula?

Availability = (time in the period − planned maintenance − downtime) ÷ (time in the period − planned maintenance) × 100. The downtime a target allows is the time in the period, with maintenance already taken out, multiplied by (100% − target).

A year has 365 days, or 366 in a leap year, and a month has 28 to 31 days. That is why 99.9% is not always the same amount of time: in a 31-day month it allows 44 minutes and 38 seconds of downtime, and in February, 40 minutes and 19 seconds. The table below uses the same formula as the calculator.

Downtime each availability target allows
Period99%99.5%99.9%99.95%99.99%
365-day year3 d 15 h 36 min1 d 19 h 48 min8 h 45 min 36 s4 h 22 min 48 s52 min 34 s
Leap year (366 days)3 d 15 h 50 min1 d 19 h 55 min8 h 47 min 2 s4 h 23 min 31 s52 min 42 s
31-day month7 h 26 min 24 s3 h 43 min 12 s44 min 38 s22 min 19 s4 min 28 s
30-day month7 h 12 min3 h 36 min43 min 12 s21 min 36 s4 min 19 s
Leap-year February (29 days)6 h 57 min 36 s3 h 28 min 48 s41 min 46 s20 min 53 s4 min 11 s
February (28 days)6 h 43 min 12 s3 h 21 min 36 s40 min 19 s20 min 10 s4 min 2 s
Week1 h 40 min 48 s50 min 24 s10 min 5 s5 min 2 s1 min
Day14 min 24 s7 min 12 s1 min 26 s43 s9 s

How do you use the result?

Compare the downtime allowed with the downtime you measured. If the contract's target is yearly, add up the outages of the whole year: one bad month can still fit inside the yearly target. The guide Telephony SLA: yearly and monthly calculation explains what counts as downtime, how to treat maintenance and why to measure with real calls.

Monitor's SLA reports do this sum for every voice circuit, every month, with the 12-month figure and the month for reference.

Leave the SLA sums to whoever measures

Monitor calls every circuit all day and delivers the year's and the month's availability in a report in English or Portuguese.